4 annual, 1 sample pump tubing replacement, 3 every 4-6 months 9.0.4 annual – Electro-Chemical Devices (ECD) CA6 Hardness Analyzer User Manual

Page 70

Advertising
background image

Replace Reagent(s) and reset reagent counters
Verify Micro Peristaltic pumps are primed and pumping
Run Calibrations:

Blank with DI water,

Slope with calibration solution

9.0.3 Every 4-6 months

(depending on applications)

Replace Peristaltic Pump tubing

Manually clean 3 Way Valve(s), with a syringe

Clean Loop Valve (option) with a syringe

Replace Colorimetric Cell o-ring

Hydraulics tubing replacement

Replace Internal Seal of the mixing pump

Clean / Replace Fittings

9.0.4 Annual
Analyzer general inspection (for qualified personnel only)

9.1 Sample Pump tubing replacement

The peristaltic pump head is located in the Liquids section. Before replacing any tubing, carefully read
the Hazards and Dangers list in Section 1 and Health and Safety data sheets for the reagents. Always
wear protective clothing, gloves and eye protection. Use extreme care during tubing replacement to
avoid spills. See MasterFlex video at

http://www.youtube.com/watch?v=zC1INbSnf8o

.

Proceed as follows:

Stop the analyzer and switch OFF the power.

Using the key, open the liquids enclosure.

Unscrew the four screws that hold the pump head in place.

Disconnect the pump tubing from its inlet and outlet fittings, use caution to avoid liquid spills.

Slide the pump head to the left and remove the pump head.

Separate the two halves. Use care with the rotor and remove the used tubing.

Place the half containing the rotor with the rollers in the 2, 6 and 10 o’ clock positions. Place
tubing in the outer groove and against the two rollers as shown. Keep your thumb on the tubing
to hold it in place and insert the tubing key on the back of the rotor shaft and push in as far as

59

Advertising