Static pressure pickup tube oe290, Static pressure pickup tube, Sputube1.cdr oe290 – Orion System OE217-00 User Manual

Page 28

Advertising
background image

Notes:

C

O

N

T

R

O

L

S

FILENAME

DATE:

B. CREWS

DESCRIPTION:

PAGE

DRAWN BY:

Static Pressure Pickup Tube

1

JOB NAME

05/21/00

SPUTUBE1.CDR

OE290

In Order To Obtain Accurate Static Pressure Readings

The Static pressure Pickup Probe Should Be Mounted

Per The Following Recommendations:

1.)The Probe Should Be Mounted In a Straight Section

Of Ductwork Approx. 2/3 The Length Of the Supply Duct,

Downstream Of The HVAC Unit.

2.)The Probe Should Not Be Mounted Less Than 3 Duct

Diameters Downstream Or Not Less Than 2 Duct

Diameters Upstream Of Any Elbow or Takeoff.

See The Systems Installation And Operation Manual For

Other Design Considerations And Recommendations

Regarding Static Pressure Pickup Tube Location.

Caution!

1.)The Static Probe(OE290) Is Supplied With A 14“

Length Of Tubing For Connection To The Static

Pressure Sensor. The Static Pressure Sensor

(OE271) Is Designed To Be Mounted Adjacent To The

Location Where The Static Pickup Tube Is Mounted

And Wired Back To The Controller Board. The Static

Pressure Sensor Can Also Be Mounted Close To The

Controller Board And Tubing (By Others) Routed

From The Sensor To The Static Pickup Probe. Be

Sure Not To Kink The Tubing Between The Static

Pickup Probe And The Static Pressure Sensor.

Static Pressure Pickup Tube OE290

Mounting Plate

Gasket

Adhesive Backed Drill Guide

Mounting Template

2-3/4“

Mounting Plate

4.0"

3/4"

1/4" Hex Head Sheet Metal Screws

Thread

Together

1/8“ MPT

Threaded Pipe

Duct Work

Drill 5/16" Hole In Ductwork For Probe

1/4“ Barb Fitting

1/4“ O.D. X 3/16” I.D. x 14” Long - Fire Rated Tubing

Slide Over 1/4“ Barb Fitting

Tubing Not To Exceed 250 Ft. Length.

Do Not Splice Tubing.

Connect This End Of Tubing To “Hi”

Port Of Pressure Sensor

Advertising
This manual is related to the following products: