Instructions for replacing steel cables, Night lite pro ii, Hydraulic vertical tower – Allmand Brothers NL PRO II User Manual

Page 106

Advertising
background image

INSTRUCTIONS FOR REPLACING STEEL CABLES

NOTE: NS = NOT SHOWN. WHEN ORDERING, SPECIFY THE COLOR WANTED ON PARTS CONTAINING THE LETTER “P”

28

NIGHT LITE PRO II

4/27/2012

HYDRAULIC VERTICAL TOWER


Section 6 -

Remove cable clamps (2) from section 4.

Remove section 6.
Remove all broken and frayed cable.
Replace new cable into slot in the bottom of section 6.
Replace section 6 into section 5.
Route cable through pulley bracket on section 5.
With all sections pushed together tight, insert cable through half-link on section 5.
Replace cable clips.

Section 5 -

Remove cable clamps (2) from section 3.
Remove machine screws (8) and pads (4) from section 4. Being careful not to drop them into
lower tower sections
Remove section 5.
Remove all broken and frayed cable.
Replace new cable into slot in the bottom of section 5.
Replace section 5 into section 4.
Route cable through pulley bracket on section 4.
With all sections pushed together tight, insert cable through half-link on section 3.
Replace cable clips.
Replace tower pads and screws. Be careful not to drop them into lower tower sections.

Section 4 -

Remove cable clamps (2) from section 2.
Remove machine screws (8) and pads (4) from section 3. Being careful not to drop into lower
tower sections
Remove section 4.
Remove all broken and frayed cable.
Replace new cable into slot in the bottom of section 4.
Replace section 4 into section 3.
Route cable through pulley bracket on section 3.
With all sections pushed together tight, insert cable through half-link on section 2.
Replace cable clips.
Replace tower pads and screws. Be careful not to drop them into lower tower sections.



Advertising
This manual is related to the following products: