Instructions for replacing steel cables, Night lite pro ii, Hydraulic vertical tower – Allmand Brothers NL PRO II User Manual

Page 107

Advertising
background image

INSTRUCTIONS FOR REPLACING STEEL CABLES

NOTE: NS = NOT SHOWN. WHEN ORDERING, SPECIFY THE COLOR WANTED ON PARTS CONTAINING THE LETTER “P”

29

NIGHT LITE PRO II

4/27/2012

HYDRAULIC VERTICAL TOWER


Section 3 -

Remove cable clamps (2) from section 1.

Remove machine screws (8) and pads (4) from section 2. Being care full not to drop into lower
tower sections
Remove section 3.
Remove all broken and frayed cable.
Replace new cable into slot in the bottom of section 3.
Replace section 3 into section 2.
Route cable through pulley bracket on section2.
With all sections pushed together tight, insert cable through half-link on section 1.
Replace cable clips.
Replace tower pads and screws. Be careful not to drop them into lower tower sections.

Note:

If broken cable, tower pads or pad screw happen to fall into lower sections they must be

retrieved . Damage to tower sections or other moving parts may occur.

Note:

When replacing tower section cables

,

the tower sections above the cable being replaced should

be removed.

Advertising
This manual is related to the following products: