TRAILERING, TRANSPORTING AND LIFTING

After completing the pre-operation check list, operate the tower through a complete opera-
tion cycle, following the operating instructions in the NIGHT LITE PRO II Operator’s Manual.

Warning!

Unsafe operation Hazard. Never permit anyone to install or operate the equipment

without proper training.

ALWAYS READ AND UNDERSTAND THE INSTRUCTIONS FIRST.

Before trailering, transporting or lifting, read Safety on page 8.

The complete engine and generator set is housed in a lockable enclosure with the frame fabricated
from heavy gauge steel mounted on a two-wheel, leaf spring axle.

BEFORE TRAILERING OR TRANSPORTING

Perform the following before trailering / transporting:

 Lower the light tower and shut down the tower lights and the engine; See Shutdown - prepare

for trailering on page 18.

 Visually inspect the trailer and equipment for damage. Repair or replace any components as

needed before trailering.

 Check the trailer lights for proper operation

 Inspect the tires to insure good condition and proper inflation.

 Inspect trailer springs and undercarriage for damage or loose parts.

 Check the hitch assembly and safety chains.

 Ensure the outriggers and jacks are properly stowed.

 Ensure the ground rod and cable are disconnected and properly stowed.

 Clean any spills from inside the trailer bilge area around the outside of the trailer; they may have

occurred during operation.

 Ensure all compartment doors are closed and securely locked.