OPERATION

Light Bar and Light Fixture Adjust-
ment ( Manual Laydown)

Lights - Work Site Adjustment

The light fixtures must be adjusted to the de-
sired work angle before raising the tower.

With the light tower fully lowered and the
lights off, the light fixtures can be manually
rotated into the desired working position.

To adjust each light fixture, manually swivel
each light fixture at its base into the desired
working position. (Figure 17).

1

1 - Grasp light fixture here to adjust.

Figure 17

Lights - Trailering storage

The light bar and light fixtures must be stowed
properly fot traiering or transporting. See
Tower Lights - Stowage for Trailering on page
19.

LAYDOWN TOWER LIGHT OPERA-
TION

Before operating the tower lights, review
Safety on page 8-16.

The laydown light tower is raised and lowered
by a manual winch actuating a 3-section tele-
scoping mast.

WARNING! Rollover hazard. Before rais-
ing, lowering or operating the tower lights,
the trailer must be set up, properly leveled
and stabilized, and ground rod installed:
see Pre-Operation Setup section on page
19.

WARNING! Crush Hazard. Allow adequate
clearance around and above trailer when
raising or lowering the light tower. Ensure
that there are no obstructions or persons
near the light tower when raising or lower-
ing the light tower.

Advertising
This manual is related to the following products: