Allmand Brothers NL PRO II User Manual

Page 4

Advertising
background image

TABLE OF CONTENTS

VERTICAL OVERALL DIMENSIONS

32

LAYDOWN OVERALL DIMENSIONS

32

GENERATOR

33

TOWER LIGHTS

33

ENGINE

34

OPTIONAL ACCESSORY EQIPMENT

35

OPERATION

36-47

PRE - OPERATION SETUP

36

WORK SITE SAFETY CONSIDERATIONS

36

PRE - OPERATION CHECK LIST

36

LEVELING AND STABILIZING THE TRAILER

37

INSTALLING THE GROUND ROD

38

ENGINE OPERATION

38

PRE - START CHECKS

38

ENGINE CONTROL PANELS

39-40

STARTING THE ENGINE

41

STOPPING THE ENGINE

41

AUTOMATIC ENGINE SHUTDOWN SYSTEM

41-42

TOWER AND LIGHT OPERATION

42

LIGHT BAR AND LIGHT FIXTURE ADJUSTMENT (MANUAL TOWER)

43

LIGHT BAR AND LIGHT FIXTURE ADJUSTMENT (VERTICAL TOWER)

44

RAISING AND LOWERING THE LIGHT TOWER (MANUAL TOWER)

45

RAISING AND LOWERING THE LIGHT TOWER (VERTICAL TOWER)

46

LIGHT CONTROL PANEL

46

SHUTDOWN PROCEDURE

46

SHUTDOWN - SHORT PERIOD

46

SHUTDOWN LONG TERM OR PREPARE FOR TRAILERING

46-47

LIGHT TOWER

32

4

Advertising
This manual is related to the following products: