Operation – Allmand Brothers NL PRO II User Manual

Page 47

Advertising
background image

47

OPERATION

OPERATION

2. Turn off the tower lights (if used).

3. Correct the excessive load problem and

wait 10 minutes, to allow the generator to
cool down before reconnecting the load.

Outlet Panel (240VAC 1 - Phase)

1

2

3

5

4

1. Main Outlet Panel 35A Circuit Breaker.

2. 30A Circuit Breaker - for 250VAC Outlet.

3. 250VAC Outlet.

4. 110VAC GFCI Outlet.

5. 20A Circuit Breaker (Push Button).

6. Grounding Lug - Connection to the

Ground Rod Lead.

6

Advertising
This manual is related to the following products: