Electrolux FOM 71 CLS User Manual

Page 57

Advertising
background image

13:1

Installation inspection of the reference machine

FOM 71 MP-Lab

Installation inspection of the reference machine

Before carrying out any major test series, inspect the installation and
check the following items:
• In order to make installation and servicing the machine easier, the fol-

lowing clearances are recommended:
o At least 500 mm between the machine and the wall behind.
o A minimum clearance of 250mm at the sides between the machine

and a wall or other machine, where more than one machine is instal-
led.

• Check the mounting bolts to the floor, as in this type of machine the

drum is attached directly to the frame. As a result, the floor under the
machine must be stable enough to absorb the dynamic forces genera-
ted during the spin cycles. For fastening details see the Operating and
installation manual for FOM 71 MP-Lab.

• Check the levelling of the machine. The vertical difference from corner

to corner of the top lid shall not exceed 5 mm. If this is not the case,
adjust the feet of the machine.

• The machine must be connected using the supplied Y hose or two

single hoses.

• Check that the amount of supply water at the water connection to

the reference machine is sufficient and in line with the specification in
the standard (15 ± 2 litre) and that the amount can be maintained in
all circumstances. Water pressure at the machine's water intake must
never fall below 100 kPa.

• Check that the power supply is compliant with the voltage specified

on the reference machine's data label and within the tolerances of the
standard (± 2%).

• Make sure that the power supply can maintain the required voltage

level whilst the reference machine is heating.

Bild 13_1.jpg

Advertising
This manual is related to the following products: