Two Compressors With Unloaders—Four-Step
The first two-step compressor is started unloaded at 33% calculated output from the temperature pro-

portional band and stopped at 17%. At 80% Compressor 1 will be loaded, at 70% unloaded.
The second compressor starts unloaded at 63% and stops at 47%. At 100%, Compressor 2 will be

loaded, at 90% unloaded (see Figure 14).
The four stages of cooling are accomplished in the following manner:

• 1 stage: One compressor, unloaded - Cool 1
• 2 stages: Both compressors, unloaded - Cool 2
• 3 stages: One compressor, loaded and one compressor, unloaded - Cool 3
• 4 stages: Both compressors, loaded - Cool 4

Figure 14 Two compressors with unloaders (four-step)

Cool 2

On

Temp Setpoint : 70°F
Proportional Band: 8°F
Deadband : 2°F

½ Dead-

band

Increasing Temperature

½ Proportional Band

75

74

73

72

71

70

0%

Cooling

+ 100 %

Cooling

Cool 4

Off

Cool 2

Off

Cool 1

Off

Cool 4

On

Cool 3

On

Cool 1

On

Cool 3

Off