Chapter 2: setup and configuration, Unpacking the fixture, Pan and tilt locking – High End Systems SHOWGUN User Manual

Page 19

Advertising
background image

SHOWGUN

®

User Manual

7

Chapter 2:

Setup and Configuration

SHOWGUN

®

fixture setup includes mounting, connecting to power and DMX

linking and configuration.

Use the following steps to set up and configure your SHOWGUN

®

fixture:

1. Unpack the fixture.

2. Install power cord cap for your location.

3. Mount the fixture upright or suspended from a standard truss.

4. Connect the fixture to a DMX controller via DMX cabling.

5. Connect the fixture to power.

6. Configure the fixture for DMX control.

Unpacking the Fixture

The SHOWGUN

®

fixture ships in a road case specifically designed to protect the product during

transport. When unpacking, inspect the fixture for physical damage to components. High End
Systems

®

assumes no responsibility for products that are damaged during transport. Return a

product for repair in its road case.

Before sending anything to the factory, call your High End Systems dealer/distributor
for a Return Material Authorization (RMA) number. The factory cannot accept any
goods shipped without an RMA number.

Pan and Tilt Locking

The SHOWGUN fixture ships with pan and tilt latches locked. You can unlock/adjust these
latches to stabilize the fixture for mounting.

Note:

Tilt Lock Position Options

Tilt Lock

Pan Lock

Disengage Pan and Tilt locks before operating the fixture.

Advertising