Furuno FAR2167DS-BB User Manual

Page 13

Advertising
background image

1-6

2. Lay the corrosion-proof rubber mat (supplied) on the mounting platform, aligning the holes on

the rubber mat with the fixing holes on the mounting platform.

3. Lay the antenna unit on the rubber mat, orienting it so the cable gland is directed toward ship's

bow. Remove the lifting fixtures and collars.

4. Fix the antenna base to the mounting platform with four M12×70 hex bolts, nuts, washers and

seal washers (supplied).

5. Arrange the ground point at a location on the mounting platform that is within 300 mm from the

ground terminal on the antenna unit. Fasten the ground wire (RW-4747, 340 mm) there, using
the M6×25 hex bolt, nut and washers.

6. Connect the other end of the ground wire to the ground terminal on the antenna unit.
7. Coat the ground terminal, ground point on the mounting platform and fixing bolts on the

antenna unit with anticorrosive sealant (supplied).

Mounting the antenna unit

Seal
washer

Corrosion-
proof
rubber
mat

Use two nuts.
(Torque: 63.5 Nm)

Fasten ground wire and then
coat with anitcorrosive sealant.

Ground wire

Antenna chassis

Hex bolt

OR

Ground wire

Coat with
anticorrosive
sealant.

Ground wire

Welding

Hex nut

Ground terminal provided on antenna base.

Lay corrosion-proof rubber mat,
bolt antenna unit to mounting
location, and coat exposed
hardware with anticorrosive sealant.

Arrange ground terminal as close
as possible to antenna unit.

Hex bolt

Flat washer

Hex nut

Spring washer

Flat washer

Flat washer

G1_1/4-A

Ground terminal

Spring washer

Advertising