5 power supply unit, Mounting considerations, Mounting procedure – Furuno FAR2167DS-BB User Manual

Page 23

Advertising
background image

1-16

1.5 Power Supply Unit

Mounting considerations

The power supply unit may be mounted on a bulkhead or a deck. Because it has no operation
requirements it can be located almost anywhere, provided the location is well ventilated.

Mounting procedure

Fix the unit to the mounting location with four 6×20 self-tapping screws (local supply). For
mounting on a bulkhead, do the following:

1. Mark location for mounting holes.
2. Screw in the self-tapping screws at the location for the bottom fixing holes, leaving a gap of

about 5 mm between the bottom of the screw head and bulkhead.

3. Set the unit to the screws inserted at step 1.
4. Fasten the self-tapping screws at the top of the unit.
5. Tighten all self-tapping screws.

Mounting dimensions for power supply unit

25

340±1

380

385

410

350±1

2-

φ

7 FIXING HOLES

R3.5

370±1

7

2-FIXING NOTCH

#50

# Minimum recommended
service space

Advertising