3 tools and equipment, Tools and equipment – FUJITSU SPARC M4000/M5000 User Manual

Page 23

Advertising
background image

Chapter 2

Preparing to Install the Server

2-9

2.3

Tools and Equipment

The following sections list the tools that are required to install the servers.

The following tools are required to install the servers:

■

Screwdriver, Phillips No. 2

■

Antistatic wrist strap

■

Antistatic mat

■

Ethernet cable of category 5 or higher

■

Console (one of the following)

■

ASCII terminal

■

Workstation

■

Terminal server (or patch panel connected to a terminal server)

■

Personal computer

■

XSCF Unit configuration information (IP Address, subnet mask, default gateway,
and so on.)

■

Domain configuration information (IP Address, subnet mask, default gateway, and
so on.)

Advertising