3-4

SPARC Enterprise M4000/M5000 Servers Installation Guide • December 2010

FIGURE 3-1

M5000 Server Dual-power Feed UPC Connections

3.2.2

Verifying the Power Input Connections Before
Applying Power

Have the site electrician verify that the input power source fulfills the power
requirements.

Refer to the SPARC Enterprise M4000/M5000 Servers Site Planning Guide for input
power requirements.

Note –

The server end of the power cords should have been connected prior to

shipment (for servers preinstalled in an equipment rack) or when the server was
mounted in the equipment cabinet. If the server ends of the power cords were not
connected previously, connect them before continuing.

#3 #2

#1 #0

UPC#1

UPC#0

UPC Interface Cables

UPC#1

AC#1

UPC#0

AC#0

Circuit
breaker

Circuit
breaker