Installing the Server

3-11

6. Confirm that the POWER LED (green) on the operator panel is lit.

7. Check the POWER LED on each component.

If the POWER LEDs are not lit see

Appendix B

for installation troubleshooting

information.

8. Press and hold the Enter key, and press the “#.” (shift-3 and period) keys.

These key combinations switch you from the domain console to the XSCF console.

9. Execute fmdump or showlogs with the error option from the XSCF Shell and

confirm that no errors are found.

See the

Section B.2.4, “Using the fmdump Command” on page B-6

and

Section B.2.2, “Using the showlogs Command” on page B-5

for details.

10. Connect the system control network to the XSCF Unit LAN port using an

Ethernet cable.

The system control network is one or more administrative consoles used to
monitor the network. This connection will replace the temporary connection made
between the administration console and the serial port on the XSCF Unit. Both
XSCF Unit LAN ports must be used to ensure redundancy in the system control
network.

Note –

The XSCF Ethernet port is IEEE 802.3i and IEEE 802.3u compliant. This

requires auto-negotiation for the port into which it terminates.

3.4.1

Verifying the Configuration

Verify the hardware configuration by following the procedure below on a console
connected to the system control network.

1. Log in to the server and access the XSCF Shell.