Chain belt, Rail assembly for chain drive opener, Rail assembly for belt drive opener – Genie 2024 User Manual

Page 10

Advertising
background image

10

FIG. 1-2 Split Rail sections.

FIG. 1-3 Split Rail assembly.

A

B

Chain Rail

Center Rail

End Rail

Wire Tie(s)

Rail Assembly for CHAIN DRIVE OPENER

NOTE: For split rail clamps, nuts, and bolts

locate Bag 0 from Box 1.

3. Remove the two rail sections that are not

connected to the chain and place them on

floor (Fig. 1-2, A).

4. Carefully remove the third rail section with

chain and plastic sleeve. Place rail section on

floor and extend chain straight out

(Fig. 1-2, B). Chain and rail should extend

approximately 7 feet.

5. Remove wire ties and plastic bag from chain.

Leave chain extended straight out on floor.

Avoid kinks in the chain by careful handling and

keeping chain flat on the floor.

6. Align the three rail sections by pulling the

chain straight and wrapping it around the

chain tensioner pulley (Fig. 1-3 & 1-4).

7. Attach the two rail clamps to the rail section

joints with (4) bolts and nuts. After both rail

clamps have been assembled to the rail sections,

securely tighten the bolts and nuts.

PN# 37026500123 05/15/2009

Rail Clamps

Rail Clamp Bolts

Rail Clamp Nuts

Rail with chain

Center Rail

End Rail

Chain

Carriage Slide

Release
Knob

ng

Power Head

NO

TE

So

me

do

ors

ne

ed

bra

cin

g. C

on

tac

t

doo

r d

istr

ibu

tor

or

ma

nu

fact

urer

for

ins

truc

tio

ns.

HIG

H S

PR

ING

TE

NS

ION

Ca

n C

au

se S

eri

ou

s In

jury

or

De

ath

Re

pa

irs

or

ad

jus

tm

en

ts m

ust

be

m

ad

e b

y a

tra

ine

d

ser

vic

e p

ers

on

us

ing

pr

op

er

too

ls a

nd

ins

tru

ctio

ns

Rail with belt

Center Rail

End Rail

Belt

Release
Knob

NO

TE

So

me

do

ors

ne

ed

bra

cin

g. C

on

tac

t

do

or dis

trib

uto

r o

r

ma

nu

fac

tur

er

for

instr

uct

ion

s.

HIG

H S

PR

ING

TE

NS

ION

Ca

n C

au

se

Ser

iou

s In

jur

y or

De

ath

Re

pa

irs

or

ad

jus

tm

en

ts m

ust

be

m

ad

e b

y a

tra

ine

d

ser

vic

e p

ers

on

us

ing

pr

op

er

too

ls a

nd

ins

tru

ctio

ns

Rail Assembly for BELT DRIVE OPENER

NOTE: For split rail clamps, nuts, and bolts

locate Bag 0 from Box 1.

3. Remove the two rail sections that are not

connected to the belt and place them on floor

(Fig. 1-2, A).

4. Carefully remove the third rail section with

belt. Place rail section on floor, remove ties on

belt and extend belt straight out (Fig. 1-2, B).

Avoid twists and kinks in the belt by careful

handling and keeping belt flat on the floor. Belt

and rail should extend approximately 7 feet.

5. Align the three rail sections by pulling the belt

straight and wrapping it around the tensioner

pulley (Fig. 1-3 & 1-4).

6. Attach the two rail clamps to the rail section

joints with (4) bolts and nuts. After both rail

clamps have been assembled to the rail sections,

securely tighten the bolts and nuts.

Belt Rail

Center Rail

End Rail

CHAIN DRIVE RAILS

BELT DRIVE RAILS

FIG. 1-4 Mount chain/belt to tensioner pulley.

Wrap around tensioner pulley

CHAIN

BELT

A

B

Chain Tensioner Pulley

Tensioner Pulley

Advertising
This manual is related to the following products: