Fru tests available for the a4/b4 fc link segment, To isolate the a4/b4 fc link – Sun Microsystems StorEdge 6900 Series User Manual

Page 60

Advertising
background image

44

Sun StorEdge 3900 and 6900 Series Troubleshooting Guide • March 2002

CODE EXAMPLE 3-8

Failed Path marked “unusable”

FRU tests available for the A4/B4 FC Link
Segment

■

The

switchtest

can only be run from the Storage Service Processor

■

The

linktest

will be able to isolate the switch and the GBIC on the switch. It

will not be able to isolate the cable or the Sun StorEdge T3+ array controller.

▼

To Isolate the A4/B4 FC Link

1. Quiesce the I/O on the A4/B4 FC link path.

2. Run

linktest

from the Storage Automated Diagnostic Environment GUI to

isolate suspected failing components.

Alternatively, follow these steps:

1. Quiesce the I/O on the A4/B4 FC link path.

2. Run

switchtest

to test the entire link (re-create the problem).

3. Break the connnection by uncabling the link.

4. Insert the loopback connector into the switch port.

# cfgadm -al

Ap_Id

Type

Receptacle

Occupant

Condition

ac0:bank0 memory connected configured ok

ac0:bank1

memory

empty

unconfigured unknown

c1

scsi-bus

connected

configured

unknown

c16

scsi-bus

connected

unconfigured unknown

c18

scsi-bus

connected

unconfigured unknown

c19

scsi-bus

connected

unconfigured unknown

c1::dsk/c1t6d0

CD-ROM

connected

configured

unknown

c20

fc-private

connected

unconfigured unknown

c21

fc-fabric

connected

configured

unknown

c21::50020f2300006355

disk

connected

configured

unusable

Advertising
This manual is related to the following products: