Setting – Sanyo PLC-WL2503 User Manual

Page 51

Advertising
background image

51

Setting

Standby mode

This function is available when operating the projector via

network.

Network .... Supply the power to the network function even

after turning off the projector. You can turn on/

off the projector via network, modify network

environment, and receive an e-mail about

projector status while the projector is powered

off.

Eco ............ Select Eco when you do not use the projector

via network. The projector’s network function

will stop when turning off the projector.

Refer to the owner’s manual of “Network Set-up and

Operation”.

Note:

• Factory default is

Network.

• When

Eco is selected and the projector is in Stand-by,

the communication of RS-232C serial port is not
available.

Timer left before Lamp is

off.

Power management

For reducing power consumption as well as maintaining

the lamp life, the Power management function turns off the

projection lamp when the projector is not operated for a

certain period.

Select one of the following options:

Ready .................. When the lamp has been fully cooled

down, the POWER indicator changes

to green blinking. In this condition, the

projection lamp will be turned on if the

input signal is reconnected or any button

on the remote control is pressed.

Shut down .......... When the lamp has been fully cooled

down, the power will be turned off.

Off ....................... Power management function is off.

Timer ................... If the input signal is interrupted and

no button is pressed for more than

30 seconds, the timer display with

No

signal appears. It starts the countdown

until the lamp is turned off. Use the Point

▲▼

buttons to set the Timer (1~30Min).

Note:

Factory default is

Ready: 5 Min.

Power management

Advertising