Sierra INNOVA-MASS 241-VTP User Manual

Page 25

Advertising
background image

Series 24-HP Instruction Manual

Chapter 2 Installation

IM-24-HP

2-11

Insertion Procedure for Meters with a Compression Connection

Figure 2-7. Flow Meter with Compression Type Fitting

1. Calculate the required sensor probe insertion length.

2. Fully retract the stem until the sensor head is touching the bottom of

the stem housing. Slightly tighten the compression nut to prevent
slippage.

3. Bolt or screw the flow meter assembly into the process connection.

Use Teflon tape or pipe sealant to improve the seal and prevent seiz-
ing on NPT styles.

4. Hold the meter securely while loosening the compression fitting. In-

sert the sensor into the pipe until the calculated insertion length, I, is
measured between the base of the enclosure adapter and the top of
the stem housing, or to the raised face of the flanged version. Do
not force the stem into the pipe.

5. Align the sensor head using the sensor alignment pointer. Adjust the

alignment pointer parallel to the pipe and pointing downstream.

6.

Tighten the compression fitting to lock the stem in position. When
the compression fitting is tightened, the position is permanent.

Caution!

The sensor alignment

pointer must point

downstream, in the

direction of flow

.

Warning!

To avoid serious injury,

DO NOT loosen the

compression fitting

under pressure

.

Advertising
This manual is related to the following products: