Sierra INNOVA-MASS 241-VTP User Manual

Page 27

Advertising
background image

Series 24-HP Instruction Manual

Chapter 2 Installation

IM-24-HP

2-13

Insertion Procedure for Flow Meters with Permanent Insertion Tool

Figure 2-9. Flow Meter with Permanent Insertion Tool

1. Calculate the required sensor probe insertion length (see previous

page). Measure from the depth marker arrow down the stanchion and
scribe a mark at the calculated insertion depth.


2. Fully retract the flow meter until the sensor head is touching the bot-

tom of the stem housing. Attach the meter assembly to the two inch
full-port isolation valve, if used. Use Teflon tape or pipe sealant to
improve seal and prevent seizing on NPT style.


3. Loosen the two packing gland nuts on the stem housing of the meter.

Loosen the stem lock bolt adjacent to the sensor alignment pointer.
Align the sensor head using the sensor alignment pointer. Adjust the
alignment pointer parallel to the pipe and pointing downstream. Tighten
the stem lock bolt to secure the sensor position.


4. Slowly open the isolation valve to the full open position. If necessary,

slightly tighten the two packing gland nuts to reduce the leakage
around the stem.


5. Turn the insertion tool handle clockwise to insert the sensor head into

the pipe. Continue until the top of the upper retractor bracket aligns
with the insertion length position scribed on the stanchion. Do not
force the stem into the pipe.

6.

Tighten the packing gland nuts to stop leakage around the stem. Do
not torque over 20 ft-lb.

Caution!

The sensor alignment

pointer must point

downstream, in the

direction of

flow.

Note

If line pressure is above

500 psig, it could require

up to 25 ft lb of torque to

insert the flow meter.

Do not confuse this with

possible interference

in the pipe.

Advertising
This manual is related to the following products: