TYPICAL INSTALLATION SEQUENCE

The typical sequence of installation follows,

however, each installation is unique resulting

in variations to those described. See the page

numbers references in the following steps for

detailed procedures.

Step 1. (Page 9) Construct the appliance fram-

ing. Position the appliance within the framing

and secure with nailing brackets.

Step 2. (Page 12) Route gas supply line to

appliance location.

Step . (Page 12) Install the vent system and

exterior termination.

Step 4. (Page 22) Field Wiring

a. Millivolt Appliances – The operating control

switch is factory installed.

b. Electronic Appliances – Connect 120 Vac

electrical power to the appliance recep-

tacle.

Step 5. (Page 23) Install blower kit (optional

equipment).

Step 6. (Page 23) Remove glass door frame

assembly.

Step 7. (Page 24) Make connection to gas

supply.

Step 8. BEFORE PROCEEDING TO STEP 9,

INSTALL A FIREBOx LINER KIT PER INSTRUC-

TIONS PROVIDED IN THE KIT (REQUIRED

- SOLD SEPARATELY).

Step 9. (Page 25) Install the logs and glowing

embers.

Step 10. (Page 27) Checkout appliance op-

eration.

Step 11. (Page 27) Adjust burner to ensure

proper flame appearance.

DETAILED INSTALLATION STEPS

The appliance is shipped with all gas controls

and components installed and pre-wired. Re-

move the shipping carton, exposing the front

glass door. Pull out the two spring loaded

latches securing the glass door (located under

the firebox floor). Remove the door by tilt-

ing it outward at the bottom and lifting it up

and off. Set the door aside protecting it from

inadvertent damage. See Figure 38a and 38b

on Page 23.

Figure 6

These instructions should be used as a guide-

line and do not supersede local codes in any

way. Install vent according to local codes,

these instructions, the current National Fuel

Gas Code (ANSI-Z22.1) in the USA or the

current standards of CAN/CGA-B149.1 and

-B149.2 in Canada.

Horizontal Vent Termination Clearances

The horizontal vent termination must have

a minimum of 3" (76 mm) clearance to any

overhead combustible projection of 2-1/2" (64

mm) or less. See

Figure 7. For projections

exceeding 2-1/2" (64 mm), see

Figure 5. For

additional vent location restrictions refer to

Figure 5 on Page 7.

Vertical Vent Termination Clearances

Terminate single vent caps relative to building

components according to Figure 6.

Termination Heights For Vents

Above Flat Or Sloped Roofs

Ref. NFPA 54 / ANSI Z22.1, 7.6

Roof Pitch

* Feet

* Meters

Flat to 6/12

1.0

0.3

6/12 to 7/12

1.25

0.38

7/12 to 8/12

1.5

0.46

8/12 to 9/12

2.0

0.61

9/12 to 10/12

2.5

0.76

10/12 to 11/12

3.25

0.99

11/12 to 12/12

4.0

1.22

The vent / air intake termination clearances

above the high side of an angled roof is as

shown in the following chart:

12

x

Roof Pitch is x/12

2 FT

MIN.

2 FT MIN.

Lowest

Discharge

Opening

H*

*H = MINIMUM HEIGHT FROM ROOF TO

LOWEST DISCHARGE OPENING OF VENT

TERMINATION HEIGHTS FOR VENTS ABOVE

FLAT OR SLOPED ROOFS

Horizontal Overhang

Vertical

Wall

Vent

Termination

Storm Collar

Concentric

Vent Pipe

Flashing

1 inch (25.4 mm) Minimum

Clearance to Combustibles

Terminate multiple vent terminations accord-

ing to the installation codes listed at the top

of this Page.

3"

(76 mm)

12"

(305 mm)

Combustible Projection greater

Horizontal Vent Termination Clearances

Combustible Projection

2-1/2”(64mm) or less in length

18"

(457 mm)

Ventilated

Soffit

Unventilated

Soffit

than 2-1/2”(64mm) in length

Side Elevation View

SV4.5HT-2

Termination Kit

SV4.5HT-2

Termination Kit

Side Exterior

Wall

MINIMUM ALLOWABLE

SIDE WALL CLEARANCE

All horizontal terminations may be

located as close as 6” (152mm) to any

(non-combustible and combustible)

exterior sidewall. This distance may be

decreased to 2” (51mm) for non-

combustible exterior sidewalls only, if

the SV4.5HT-2 termination is used.

Advertising
This manual is related to the following products: