0 installation, 1 preparation, 2 tower ups installation – Liebert GXT 2U User Manual

Page 12: Nstallation, Preparation, Tower ups installation, Caution, Ups i

Advertising
background image

Installation

8

4.0

I

NSTALLATION

4.1

P

REPARATION

1. Visually inspect the UPS for freight damage. Report damage to

the carrier and your local dealer or Liebert representative.

2. Decide where to place the GXT 2U. Install the UPS indoors in a

controlled environment, where it cannot be accidentally turned off.

Place it in an area of unrestricted airflow around the unit, away

from water, flammable liquids, gases, corrosives, and conductive

contaminants. Maintain a minimum clearance of 4 in. (100mm) in

the front and rear of the UPS. Maintain an ambient temperature

range of 32°F to 104°F (0°C to 40°C).

3. The GXT 2U may be installed in either a tower configuration or in

a rack, depending on available space and use considerations.

Determine the type of installation and follow the appropriate

instructions in either 4.2 - Tower UPS Installation or 4.3 -

Rack-Mount UPS Conversion and Installation.

4.2

T

OWER

UPS I

NSTALLATION

When using the GXT 2U in a tower configuration, use the included

support base (shown below, left) to stabilize the UPS.
If any battery cabinets are added, they will include spacers to accom-

modate the additional cabinets (shown below, right).

!

CAUTION

The UPS is heavy (see 11.0 - Specifications). Take proper

precautions when lifting or moving it.

NOTE
UPS operation in temperatures above 77°F (25°C) reduces

battery life.

Support base

Spacers added to support

base to accommodate

additional battery cabinets

Advertising