Installation 12 – Liebert GXT 2U User Manual

Page 16

Advertising
background image

Installation

12

8. Secure front of the equipment to rack mounting rails to prevent

the equipment from sliding out of position. If securing holes are

provided on front of the equipment that align with the center holes

on return flange of front members, you can use the four (4) extra

M5 screws provided in this kit to secure the equipment.

Otherwise, the equipment should be secured to front of rack

mounting rails with four (4) customer-supplied fasteners.

9. To orient the display for

horizontal viewing, remove the

front plastic bezel by pulling

forward evenly on both sides.

The unit has two front panel

overlays. Remove the outer

overlay (used for tower

installation). This reveals a

horizontally oriented front

panel overlay for rack

mounting. Snap the front bezel

back into place.

10. Once the UPS is installed in

the rack, the load may be

connected. Ensure the load

equipment is turned off; plug

all loads into the output

receptacles on the rear of the

UPS.

11. Plug the UPS into a dedicated

wall receptacle properly

protected by a circuit breaker

or fuse in accordance with national and local electrical codes. Use

a 15 amp rated device for the 500, 700, 1000, or 1500 VA units,

20 amp for the 2000 VA, and 30 amp for the 3000 VA. The wall

receptacle must be grounded.

12. Turn ON the UPS by pressing the ON button; then turn on the

connected load equipment. The UPS is now providing conditioned

power to your equipment.

+

UPStation GXT

AC INPUT

BATTERY

UPS ON

BYPASS

+

UPStation GXT

AC INPUT

BATTERY

UPS ON

BYPASS

Vertical

overlay

for

tower

UPS

Horizontal overlay

for rack UPS

Advertising