Caution – Liebert GXT 2U User Manual

Page 15

Advertising
background image

Installation

11

5. Prepare the UPS or battery

cabinet (the “equipment”) for

rack mounting by following

instructions in the equipment’s

user manual. The equipment

may require additional parts to

be added or parts to be removed

for rack mounting. After it is

prepared, lay equipment in

rack-mounting position. Fasten

inner members from Step 2 to

the equipment on both sides as

shown in the figure at right

with (8) M4 screws provided in

this kit. Make sure retaining

latch is near the rear of the equipment (also shown in figure).

6. Open grease packet provided

in this kit. Apply a 1" long

bead of grease four (4) places

inside the bottom, curved

tracks of front members as

shown at right. The grease

will allow the equipment to

slide into the bracket

assemblies more easily.

7. Insert the equipment, with inner members attached from Step 5,

into bracket assemblies by inserting top and bottom edges of inner

members into the top and bottom, curved tracks of front members

and sliding the equipment into rack (see figure in Step 6). Ends of

inner members are tapered to allow rear of the equipment to be

angled upward before insertion, if space allows.
Then the rear, bottom edges of inner

members can be placed into front

edge of bottom tracks, and the front of

the equipment can be tipped up into

horizontal position to insert the top

edges of inner members before sliding

the equipment into rack (see figure at

right). The equipment should move smoothly into bracket assem-

blies. If not, recheck alignment of front and rear members from

Steps 3 and 4.

!

CAUTION

Lifting equipment into rack may be a two-person job, depending

on weight of equipment. See equipment’s user manual.

UPS or battery

cabinet

Front

M4

screws

M4

screws

Retaining

latch

UPS or

battery

cabinet

Apply

grease

(inside)

Apply grease

Advertising