step 5. Secure the fireplace to the side framing

members using the nailing flange. Use 8d nails

or equivalent (Figure 18).

Note: The nailing flange and the area directly

behind the nailing flange are exempt from the

clearances described on page 5.
Maintain the following minimum clearance

from the firebox wrapper to the framing at the

closest point of contact, directly adjacent to

the flange:
• Est-36 and Est-42: 1/2" min.
• Est-50: 3/4" min.

For installations in Canada, continue with

Steps 6 through 9, below.

step 6. Remove one of the knockouts from the

fireplace transition and attach the 4" (102 mm)

collar from the Cold Climate Kit to the transition

with four (4) No. 8 x 1/2" screws provided (Fig-

ure 19, below). See “Installation Components”

on page 24 for catalog/part numbers.

Figure 20

step 3. Position appropriate firestop spacer

at ceiling and nail temporarily with two (2) 8d

nails. Use flat firestop spacer, Model F10FS-2, if

chimney penetrates ceiling vertically. If chimney

penetrates ceiling at 30° angle (offset chimney),

use 30° firestop spacer, Model F10FS30-2

(refer to “30° Chimney Offset through

Floor or Ceiling” and Figures 42 and 43 on

page 18). Use one nail on opposite sides

to hold firestop spacer in position. Nail

permanently, using at least two (2) more

8d nails, after chimney sections have been

assembled through the firestop spacer and after

any necessary adjustments have been made.

Firestop spacer must be secured by at least four

(4) 8d nails when completely installed.

Note: If there is a room above ceiling level,

firestop spacer must be installed on the bottom

side of the ceiling. If an attic is above ceiling

level, firestop spacer must be installed on top

side of ceiling joist (Figures 21 and 22).

Firestop Spacer

Room Above

Firestop Spacer

Attic Above

Figure 22

Note: If the fireplace is installed against an

inside wall, the Class 0 air duct may be ex-

tended into a ventilated attic space at least 18"

(457 mm) above the attic floor. Secure the duct

hood to a vertical post with the inlet positioned

downward. Ensure nothing blocks the hood

opening. This air duct must never terminate

higher than the chimney.

step 9. Cut or frame hole through the outside

wall for the installation of the duct inlet hood.

A 4-1/2" (114 mm) diameter hole is sufficient.

Feed the loose end of the flexible duct through

the hole cut for the inlet hood and attach to

collar on inlet hood using two (2) No. 6 x 3/8"

screws provided. Insert hood into opening.

Secure hood in place with the No. 8 x 1-1/2"

screws provided or with nails driven through

holes in hood flange. Seal with noncombustible

waterproof silicon type caulking. If additional

duct is needed, use Class 0 metallic duct.

InstallIng thE chImnEy systEm

step 1. Before continuing, check the operation

of the damper, as described on page 4, (refer

to Figure 3).

step 2. Using standard construction framing

techniques, construct opening for chimney

route up through the ceiling(s) and roof or

through an outside chase.

Framing must maintain adequate minimum air

space clearance at all times.

cautIon: alloW mInImum 2" chImnEy

aIr spacE to combustIblE framIng mEm-

bErs throughout VErtIcal or offsEt

chImnEy InstallatIon.

a minimum 2" air space must be reserved for

all combustible materials extending for any

continuous length surrounding the chimney.

For minimum ceiling and roof dimensions, see

Figure 16 (Ceiling Framing) and Figure 17

(Roof Framing) on the previous page.

In new construction, to determine chimney

center line, use plumb line from roof or ceil-

ing above fireplace to center of flue collar on

fireplace.

For remodeling, plumb to center of flue collar

from ceiling above, drive nail through ceiling

from below to mark position, then mark and

cut to passage from above ceiling (around

nail) (Figure 20). Then plumb from ceiling or

roof level directly above hole which has just

been completed.

(Optional

Position)

Cold Climate Kit

(Canada only)

step 7. Connect the 4" (102 mm) Class 0 air

duct to the collar with two (2) No. 8 x 1/2"

screws provided in the hardware kit.

step 8. Route the Class 0 air duct out the back

wall or side wall, up through the ceiling or floor

joists to an outside wall. The air duct should be

located above snow level.

Plumb Line

Figure 21

Figure 19

Nailing

Flange

Framing

Stud

8d Nail

Figure 18

Advertising