Lamp test, Ending an active test – Paradyne 7612 SNMP DSU User Manual

Page 57

Advertising
background image

Testing

7-6

7612-A2-GB20-10

November 1997

Lamp Test

The DSU supports a Lamp test from the Test menu to determine whether all
LEDs are lighting and functioning properly.

During the Lamp test, all LEDs blink simultaneously every second. When you
stop the Lamp test, the LEDs are restored to their normal condition.

Ending an Active Test

A test initiated by the user can be ended by the user.

H

A Test Timeout option is available to automatically terminate a user-initiated
Loopback or Pattern test (as opposed to manually terminating a test) after it
has been running a specified period of time. Refer to Table A-1,

System

Options

.

Test Timeout does not pertain to tests commanded by the:

— Network, such as the network-initiated CSU and DSU Loopbacks.

— DTE, such as the DTE-initiated Local Loopback.

H

On each test screen is a command column. Pressing Return when the cursor
is on the Stop command stops the test.

H

Use the Abort All Tests selection from the Test menu to stop all tests running
on all interfaces, with the exception of network or DTE-initiated loopbacks.
Command Complete appears when all tests on all interfaces have been
terminated.

Test status messages appear in the right column of the System and Test Status
screen. See Table 6-3,

Test Status Messages

, in Chapter 6,

Monitoring the DSU

.

Advertising