Cp3 bt26 – National CP3BT26 User Manual

Page 259

Advertising
background image

259

www.national.com

CP3

BT26

Figure 125.

ACB Signals (SDA and SCL) Timing

Figure 126.

ACB Start and Stop Condition Timing

Figure 127.

ACB Start Condition Timing

SCL

0.7VCC

Note: In the timing tables the parameter name is added with an "o" for output signal timing and "i" for input signal timing.

0.3VCC

t

SCLf

0.7VCC

0.3VCC

t

SCLr

SDA

0.7VCC

0.3VCC

t

SDAf

0.7VCC

0.3VCC

t

SDAr

DS106

SCL

SDA

t

DLCs

t

CSTOs

t

CSTRh

Stop Condition

Start Condition

t

BUF

Note: In the timing tables the parameter name is added with an "o" for output signal timing and "i" for input signal timing.

DS107

SCL

SDA

t

DHCs

t

CSTRs

Start Condition

t

CSTRh

Note: In the timing tables the parameter name is added with an "o" for output signal timing

and "i" for input signal timing.

DS108

Advertising