Refrigerant piping, Pipe forming/end positioning – Toshiba RAM-SM560BT-E User Manual

Page 11

Advertising
background image

8

4

REFRIGERANT PIPING

85mm

Marked line

90˚

Obliquity

Roughness

Warp

B

A

Pipe Forming/End Positioning

<SM560AT-E>

• Forming of pipe

Form the pipe along with a marked line of the cabinet.

• End positioning of pipe

Match the ends of both pipes at at a distance of
85 mm apart from the marked line.

+0
- 0.4

Outer dia. of copper pipe

6.35

9.52

12.7

15.9

A

R410A

R22

9.1

9.0

13.2

13.0

16.6

16.2

19.7

19.4

Flaring

1. Cut the pipe with a pipe cutter.

2. Insert a flare nut into the pipe, and flare the pipe.

As the flaring sizes of R410A differ from those of
refrigerant R22, the flare tools newly manufactured
for R410A are recommended.
However, the conventional tools can be used by
adjusting projection margin of the copper
pipe.

• Flaring size : A (Unit : mm)

* In case of flaring for R410A with the conventional

flare tool, pull it out approx. 0.5 mm more than that of
R22 to adjust to the specified flare size. The copper
pipe gauge is useful for adjusting projection margin
size.

• Projection margin in flaring : B (Unit : mm)

Rigid (Clutch type)

Outer dia. of copper pipe

6.35

9.52

12.7

15.9

R410A

R22

1.5 to 2.0

1.0 to 1.5

1.5 to 2.0

1.0 to 1.5

2.0 to 2.5

1.5 to 2.0

2.0 to 2.5

1.5 to 2.0

Outer dia.

of copper

pipe

6.35

9.52

12.7

15.9

R410A tool used

R410A

R22

0 to 0.5

(Same as left)

0 to 0.5

(Same as left)

0 to 0.5

(Same as left)

0 to 0.5

(Same as left)

Conventional tool used

R410A

R22

1.0 to 1.5

0.5 to 1.0

1.0 to 1.5

0.5 to 1.0

1.0 to 1.5

0.5 to 1.0

1.0 to 1.5

0.5 to 1.0

Imperial (Wing nut type)