External view requirement, Hanging down of indoor unit, Dimension – Toshiba RAM-SM560BT-E User Manual

Page 71

Advertising
background image

68

15 to 20

Hanging bolt

Square washer

Hexagonal nut

Nut with flange
(or washer and nut)

20 to 30

External view

REQUIREMENT

The hanging bolt pitch on horizontal direction (B) is not halved at center with the ceiling opening size.

Therefore, check the relational position in the following figure.

1. Hanging down of indoor unit

Refer to installation figures of hanging material
and hanging bolt.

• Adjustment of hanging bolt length and nut

position

Adjust hanging bolt length and nut position as
shown in the figure before hanging down the
indoor unit.

NOTE :

Be sure to set the indoor unit horizontally so as not to
cause malfunction of the float switch or leakage of water.

Considering pipe/wire connecting work inside the ceiling after the indoor unit has been hanged, select an installation
place and determine piping direction.

• If the ceiling has been already set, prepare refrigerant pipe, drain pipe, connecting wire, switch panel cord, etc. at

the place where pipe and wire are connected before hanging the main unit.

• Dimension

RAV-SM560BT-E

RAV-SM800BT-E

A

B

F

G

H

J

K

M

N

700

750

12.7

6.4

252

280

280

1

2

1000

1050

15.9

9.5

252

580

290

2

3

Hanging bolt pitch B

Main unit dimension A

Hanging bolt

H

4-M10 screw
(Arranged
locally)

Refrigerant pipe
connecting port
(Liquid side ØG)

Main unit dimension 800

75

25

210

Hanging bolt pitch 565

720
630

170

320

Drain pipe connecting port
For vinyl chloride pipe
(Inner dia. 32,
Nominal dia. 25)

2-Ø26 power supply,
pull-out port of remote
controller cord

460~640

450

Ceiling opening

dimension

470

305

155 to

335

120

90

Ø125 knockout hole
(Rear face)

Check panel

Suction port
(with air filter)

J = M x K

Refrigerant pipe
connecting port
(Gas side ШF)