Prepare boiler — placement & setup, Inspect orifi ces and burners, Orifi ce replacement procedure – Weil-McLain GOLD CGS 550-110-260/0508 User Manual

Page 12

Advertising
background image

Part number 550-110-260/0508

12

GOLD CGs Gas-Fired Water Boiler — Boiler Manual

Place boiler/crate near
position

1. Leave boiler in crate and on pallet until installation

site is ready.

2. Move entire crate and pallet next to selected loca-

tion.

3. Remove

crate.

4. Remove boiler from pallet.

Do not drop boiler or bump jacket
on fl oor or pallet. Damage to boiler
can result.

a. Tilt left side of boiler up and place a board

under left legs.

b. Tilt boiler the other way and place a board

under right legs.

c. Slide boiler backward off pallet and into posi-

tion.

5. Check level.

a. Shim legs, if necessary.
b. Do not alter legs.

Prepare boiler — placement & setup

2a

Table 2

Manifold orifi ce sizing

Inspect orifi ces and burners

1. Remove front jacket door. Remove inlet air box top

panel (see

Figure 27

, item

13

, page 56).

2. Check for correctly-sized manifold orifi ces. See

Table 2

for sizing. (The orifi ce size is stamped on

the orifi ce spud barrel.)

Correctly-sized manifold orifices
must be used. Failure to do so will
result in severe personal injury,
death or substantial property dam-
age.

3. Reinstall inlet air box top panel.

Orifi ce replacement procedure

(when required)

1. Remove the screws securing the inlet air box top

panel.

2. Remove inlet air box top panel and inspect the fi ber

gasket. Verify the gasket is in good condition and can
seal around the complete perimeter of the air box.
Replace the gasket if necessary.

3. Using

a

7

/

16

” open-end wrench, remove the burner

orifi ces from the manifold.

4. Apply a small amount of pipe dope to each of the

new orifi ces and install in the manifold using a

7

/

16

open-end wrench. Make sure the orifi ces are aligned
correctly, not cross-threaded in the manifold tap-
pings.

Use only pipe dope compatible with
propane gas, even if boiler is to be
operated on natural gas. Failure to
comply could result in severe per-
sonal injury, death or substantial
property damage.

5. Carefully replace the inlet air box top panel, making

sure the gasket is in place will seal all around the
perimeter.

6. Follow the check-out procedure, Section

8

page 30,

to assure the boiler is now operating properly after
orifi ces are replaced.

Location

Natural gas

Propane gas

U. S.

0-2,000 ft

over 2,000 ft

0-2,000 ft

over 2,000 ft

2.70 mm

(Note 1)

1.65 mm

(Note 1)

Canada

0-2,000 ft

2,000-4,500

0-2,000 ft

2,000-4,500

2.70 mm

#38

1.65 mm

#53

Note 1:

For elevations above 2,000 feet, contact your local Weil-McLain sales office for details.

Inlet air box top panel must be in
position during boiler operation.
Failure to do so could result in
severe personal injury, death or
substantial property damage.

Advertising