Visual Inspection of Mechanical Connections

152606

4–3

Visual Inspection of Mechanical Connections

To perform a visual inspection of the PV225S mechanical connections:

Visual Inspection of Electrical Connections

To perform a visual inspection of the PV225S electrical connections:

1.

Ensure that the AC and DC Disconnect Switches, as well as any utility
interconnect circuit breakers or main disconnect switches, are opened.

❐

2.

Ensure all anchor bolts and any required seismic bracing is properly
tightened and in place.

❐

3.

Remove the wiring access panels and front covers from the AC
Interface/Transformer assembly and Main Inverter Inductor Enclosure.

❐

4.

Remove the latches and open the doors of the Main Inverter Enclosure,
the AC and DC Interface Enclosures, and Communication Enclosure
and inspect.

❐

5.

Verify all wire conduit fittings and connections are properly tightened.

❐

1.

Ensure that the AC and DC disconnect switches, as well as any utility
interconnect circuit breakers or main disconnect switches, are opened.

❐

2.

Ensure all conductors and wiring connections interfacing with the
PV225S are tightened to the correct torque value.
For specific torque values, see Table 3-1, “AC Terminal Wire Gauge,
Bolt Size, and Torque Values” on page 3–12 and Table 3-2, “DC
Terminal Wire Gauge, Bolt Size, and Torque Values” on page 3–12.

❐

3.

Verify AC power conductors terminated at TB5, TB6, TB7 within the
Main Inverter Enclosure are terminated correctly and properly
sequenced.

❐

4.

Verify the AC power conductors terminated at S1-2T1, S1-4T2,
and S1-6T3 within the AC Interface Enclosure are terminated correctly
and properly sequenced.

❐

5.

Verify DC power conductors terminated at S2-6, K2-6T3, and TB4
within the DC Interface Enclosure are terminated correctly and properly
polarized.

❐