Installing the th link, Th link, On top-hat rail 4 stop lever – VEGA TH LINK Version 1.1 Installation Guide User Manual

Page 14

Advertising
background image

Installing the TH LINK

Trebing & Himstedt Prozeßautomation GmbH & Co. KG | TH LINK

14

Installing the TH LINK

Installing the TH LINK

Fig. 2: Installing and removing of the TH LINK

Place the notch of the TH LINK on the top-hat rail and move the
TH LINK downward until the stop lever locks into place on the
top-hat rail.

Warning!

Above and below the TH LINK, a minimum of 2
inches head space for heat dissipation needs to
be available.

1 Device with notch on top-hat rail

2 Top-hat rail

3

TH LINK

on top-hat rail

4 Stop lever

TH LINK

Trebing & Himstedt Prozeßautomation GmbH & Co. KG

www.t-h.de

Made in Germany

Part No.:

10003006

HW-Release: 2.0
Serial No.:

000000

Temperature:

0 to +50 °C

Current: 190

mA

max.

Power Supply: 19.2 to 28.8 V DC

ETH: Ethernet

(green/red)

RUN:

OK (green) | Error (red)

BUS: PROFIBUS

(green/red)

24 V DC

+ –

TH LINK

Tre

bing & H

imsted

t Proz

eßau

toma

tion G

mbH

& C

o. K

G

ww

w.t-

h.de

Made

in G

ermany

Part No.:

10003006

HW-Release: 2.0

Serial No.:

000000

Temperature:

0 to +50 °C

Current:

190 mA max.

Powe

r Supply:

19.2 to 28.8 V DC

ETH: Ethernet

(green/red)

RUN:

OK (green) | Error (red)

BUS: PROFIBUS

(green/red)

24 V DC

+

[1]

[3]

[2]

[4]

Advertising