8. Installation

PNEG-1276 Top Dry Autoflow Construction Manual 24', 30' and 36'

37

Purlin Installation

24' Intermediate Purlin

Counting up from the lower end of the rafter, on the underneath side, the angle purlins bolt in the third hole
using 5/16" x 3/4" bin bolts. The angle is to be bolted to the underneath side of the rafters, joining rafter to
rafter, with the angle interior angle facing the center of the bin as shown in

Figure 8C

. Tighten all bolts.

Figure 8C

The angle is to be bolted on the underneath side of the rafters, joining rafter to rafter, with the
angles interior angle facing the center of the bin.