Small platform assembly, Assembly – Grain Systems PNEG-1276 User Manual

Page 63

Advertising
background image

9. Assembly

PNEG-1276 Top Dry Autoflow Construction Manual 24', 30' and 36'

63

Small Platform Assembly

For 36" Fans and Smaller or with #1 fan when two (2) 36" or smaller fans
are installed

Before assembling any platform, read all of the instructions first to assure proper placement and assembly.

Refer to Figure 9O

for proper location of small platform. Begin by assembling the small platform support

frame using 3/8" x 1" bolts on all connections. Use 5/16" x 1-1/4" bin bolt to attach platform vertical
supports to sidewall stiffeners.

Be sure and locate the 5/16" x 1-1/4" bolts from the inside of the bin to the outside. This will provide
maximum weather protection.

Figure 9O

Ref #

Part #

Description

Weight

Qty

1

TD-100051

Channel Bracket

3.90

8

2

TD-100052

Handrail Post 49-3/4"

31.69

4

3

TD-100059

Long Toeboard 78-1/2"

10.96

2

4

TD-100060

Short Toeboard 54-1/2"

3.80

1

5

TD-100061

Long Handrail 78-1/2"

37.52

4

6

TD-100062

Short Handrail 54-1/2"

13.02

2

7

TD-100064

Floor Plank 78"

112.87

11

8

TD-100066

“X” Brace Strap 60"

7.26

4

9

TD-100067

Mid Channel Support 74"

32.73

2

10

TD-100070

Side Channel Support 78-1/2"

41.26

2

11

TD-100072

End Channel Support 78-1/2"

41.60

2

12

TD-100686

Vertical Support 70"

43.11

2

13

TD-100083

Support Channel 80-7/8"

32.98

2

14

TD-100084

Knee Brace 83-5/8"

23.67

2

N/S

TD-100090

Small Platform Hardware Package

8.96

1

Advertising