24' leveling band post installation – Grain Systems PNEG-1276 User Manual

Page 44

Advertising
background image

8. Installation

44

PNEG-1276 Top Dry Autoflow Construction Manual 24', 30' and 36'

24' Leveling Band Post Installation

Install the leveling band posts on the floor as shown in

Figure 8M

.

The fourth and eighth holes in the floor sheet indicate the location of the leveling band posts. Attach posts
with 5/16" x 1-1/4" bin bolts (S-277). The third hole from the bottom of the sheet, there will be
eight (8) posts (1 every third sheet). In the eighth hole there will be four (4) posts (1 every sixth sheet).
After all of the posts have been installed fill the unused holes with 5/16" x 1-1/4" bin bolts.

Figure 8M

Advertising