SERIES TWO HEATER

1. Propane vapor models are designed to run directly

off of a supply tank or from a separate external va

porizer.

2. Run proper size line (see specifications on page 6) to

pipe train on heater. Have a qualified gas service

person inspect installation to be sure that everything

is installed according to local codes and ordinances.

3. After installation is complete check all connections

for leaks. DO NOT USE FLAME FOR

LEAK

TESTING.

LIQUID PROPANE

MODELS

NATURAL GAS MODELS

PROPANE VAPOR

MODELS

1. Natural gas models are designed to run directly off

of a supply tank or from a separate external vapor

izer.

2. Run proper size line (see specification on page 6) to

pipe train on heater. Have a qualified gas service

person inspect installation to be sure everything is

installed according to local codes and ordinances.

3. After installation is complete check all connections

for leaks. DO NOT USE FLAME FOR

LEAK

TESTING.

3. After installation is complete check all connections

for leaks with liquid detergent or comparable. Wear

rubber gloves and eye protection. Avoid contact with

liquid propane. DO NOT USE FLAME FOR LEAK

TESTING.

1. L.P. models are designed to run on liquid propane

with liquid draw from the propane tank. Avoid using

propane supply tanks that have been used for vapor

draw for long periods of time. When using liquid

draw systems any moisture that may be present in

tank or lines may freeze when system is used in cold

weather. To avoid this situation, purge the system

with methanol.

2. Run proper size line (see specification on page 6) to

liquid pipe train on heater. Have a qualified gas ser

vice person inspect installation to be sure that every

thing is installed according to local codes and ordi

nances.

FUEL CONNECTION

HEATER INSTALLATION

Standard electrical safety practices and codes should

be used when working with a heater. Refer to the

National Electric Code Standard Handbook by the

National Fire Protection Association. A qualified

electrician should make all wiring installations.

IMPORTANT! Do not use propane tanks that have

previously been used for ammonia unless they have

been purged according to procedures of the Na-

tional L.P. Association.

Fuel supply system must comply with local codes

for L.P. gas installation.

ALWAYS DISCONNECT AND LOCK OUT

POWER

BEFORE WORKING ON OR AROUND

HEATER