Heater opoeration procedure, Series two heater – Grain Systems PNEG-584 User Manual

Page 12

Advertising
background image

12

SERIES TWO HEATER

ALWAYS DISCONNECT

AND LOCK OUT POWER

BEFORE WORKING ON OR

AROUND HEATER

The control panel display showing initial start up.

up with the main display alternating between a "FAN"

and "ON" message. This may be bypassed by depress-

ing and holding the "FAN BYPASS" switch (lower right

switch). Normal operating procedure should be to power

up the controller with the fan off.

If multiple heaters are tied together, and the mas-

ter detects that the slave fan is on (the air switch

stuck?), the master will lock up displaying "SLA ER-

ROR". This condition may be bypassed with the "FAN

BYPASS" switch.

All safety and high limit switches are checked upon power

up. If a safety or limit is open, the control displays it. The

control cannot operate with a safety switch error, and the

fan cannot turn on with an error condition. There is no way

to bypass an error condition. It must be fixed. (see errors on

page 20)

The air switch is also checked on power up. The

air switch must indicate no airflow. This is necessary

to check the function of the air switch. However, if

the opera-tor forgets and turns the fan on before the

controller has been powered up, the controller locks

Standard electrical safety practices and codes should be

used when working with a heater. Refer to the Na-

tional Electric Code Standard Handbook by the Na-

tional Fire Protection Association. A qualified elec-

trician should make all wiring installations.

POWER UP

HEATER OPOERATION PROCEDURE

Advertising