6.5 Lubrication of Bearings

Grease lubrication

For quality of grease refer to chapter 7.4.
For quantity of grease refer to chapter 7.4.

The bearings are already filled with lithium based

grease at the factory and are thus ready for use.

The grease provided is suitable for a temperature

range from -30° to +90°C (measured at surface of
bearing bracket).

Re-lubrication via the two grease nipples (G).
Bearing temperature (measured at bearing

bracket) should lie max. 50°C over ambient
temperature and must not exceed 90°C, control
weekly at least. On grease lubrication the bearing
temperature can temporarily be higher by 5-10°C
after regreasing, till a possible surplus of grease in
the bearings is cut.

6.6 Monitoring

In areas endangered to explosion it is
recommended to monitor the temperature of the
bearings and the vibrations of the bearing
bracket.

Regular monitoring and maintenance will extend
the life of your pump or pump system

.

Check pump for leaks at least once a week.
On packing, check quantity of leakage at least

once a week (see chapter 6.2 section "Packing").

Check the regulating and monitoring devices of

any sealing, flushing or cooling systems once a
week to ensure that they function properly.
Outgoing cooling water should be hand warm.

With double mechanical seals, monitor pressure

and flow rate in mechanical seal area; check at
least once a week.

Pumps which are exposed to corrosive chemicals

or to wear through abrasion must be inspected
periodically for corrosion or wear and tear. The
first inspection should be carried out after six
months. All further inspection intervals should be
determined on the basis of the state of the pump.

6.7 Shutting down

Close the valve in discharge pipe right before

(max. 10 seconds) switching off the motor. This is
not necessary if there is a spring-loaded check
valve.

Switch off motor (make sure it runs down quietly).
Close the valve on suction side.
Close auxiliary systems. Do not shut down cooling

system until pump has cooled down.

If there is any risk of freezing, empty pump,

cooling areas and pipes completely.

If the pump also remains under operating

conditions (pressure and temperature) when
stationary, leave all sealing, flushing and cooling
systems switched on.

The shaft sealing must remain sealed if there is a

risk of air being sucked in (in the event of supply
from vacuum systems or parallel operation with
shared suction pipe).

6.8 Storage / longer periods of non-
operation

6.8.1 Storage of new pumps
If the putting into operation shall happen a longer
period after the delivery, we recommend the following
measures for the storage of the pump:

Store pump at a dry place.
Rotate pump by hand at least once a month.

6.8.2 Measures for longer putting out of operation
Pump remains installed and in ready for operation:

Test runs of 5 min. duration must be made in

regular intervals. The span between the test runs
is depending on the plant. However, it should be
made once a week, at least.

6.8.3 Longer periods of non-operation

After long stationary periods, packing may have
hardened; these must be replaced before start-
up.
When starting up, follow the instructions for
starting up for the first time (see chapter 6)!


a) Filled pumps

Switch stand-by pumps on and immediately off

again once a week. Possibly use as main pump.

If the stand-by pump is at operating pressure and

temperature, leave all sealing, flushing and
cooling systems switched on.

Replace the grease in the bearings after 2 years.
Stuffing box must be adjusted to maintain

lubrication of the packing (e.g. do not over
tighten).


b) Drained pumps

Turn shaft at least 1x week (do not switch on

because of dry running).

Replace the grease in the bearings after 2 years.
If the pump jams, it can be loosened with

moderate pounding on the coupling in the axial
direction. Use a plastic hammer for this.