745-814-B11-001, Rev. C (03/2014)

9.2

Verifying Correct Hardware Interconnection

The BAT A/B and BAT C/D LED indicators on the front panel of the DSM3 Series unit should illuminate

solid green once the battery wiring harnesses are correctly installed. A system with multiple strings must

use String A as the first string, B as the second, C as the third and D as the fourth.

The DSM3x model provides both BAT A/B and BAT C/D LED indicators and battery harness connectors

(supports a maximum 4 battery strings). The DSM3 model provides only the BAT A/B LED indicator and

battery harness connector (supports a maximum 2 battery strings).

NOTE:

From the Power Supplies and Batteries section of

General tab of the DSM3 Series Web page, the

following screen will be visible and the parameters shown will be available for viewing and verification.

To test hardware interconnection using the Ethernet port, verify valid values for Output Voltage, Output

Current and individual battery voltages.

Fig. 9-3, Power Supply Section - General Page

9.0 Start Up and Verification