Post installation check, Basic commissioning and start-up – Fluid Components International ST100 Series User Manual

Page 19

Advertising
background image

ST100 Series Flow Meter

INSTALLATION

Fluid Components International LLC

15

The instrument LCD display functions as a basic HMI setup tool. The four buttons (IR sensors) located at the 3, 6, 9 and 12 o’clock positions on the

display provide access to the basic setup parameters. The screen flow is shown in figure 18. The HMI setup menu can be accessed thru the window

without removing the electronics enclosure lids. This is done by holding your finger in front of the 12 o’clock sensor for 3 seconds. The LCD acknowl-

edges the button selection by inverting the display characters and background while the button is held.

Reference the following wiring diagrams in Appendix B for specific integral and remote mounted electronics.

Figure B-1 : Integral - AC Input Power, Analog and HART Output
Figure B-2 : Remote - AC Input Power, Analog and HART Output
Figure B-3 : Integral - DC Input Power, Analog and HART Output
Figure B-4 : Remote - DC Input Power, Analog and HART Output

Figure B-9 : Integral - AC Input Power, Modbus Output
Figure B-10 : Remote - AC Input Power, Modbus Output
Figure B-11 : Integral - DC Input Power, Modbus Output
Figure B-12 : Remote - DC Input Power, Modbus Output

Figure B-5 : Integral - AC Input Power, F

oundation

fieldbus Output

Figure B-6 : Remote - AC Input Power, F

oundation

fieldbus Output

Figure B-7 : Integral - DC Input Power, F

oundation

fieldbus Output

Figure B-8 : Remote - DC Input Power, F

oundation

fieldbus Output

Figure B-13 : Remote - 8 Conductor Interconnection Cable

Figure B-14 : Source - Pulse/Fequency Output
Figure B-15 : Sink - Pulse/Fequency Output

ST102/STP102
Figure B-16 : Flow Element Connection - Integral/Remote
Figure B-17 : Flow Element Connection - Remote

STP100/STP102
Figure B-18 : Remote - 10 Conductor Interconnection Cable

Post Installation Check

Verify all wiring connections are secure and correct to the appropriate wiring diagram. Verify the flow direction arrow on the flow element is pointing

in the correct direction. Verify the mechanical process connection is secure and meets the system pressure requirements.

Basic Commissioning and Start-Up

When all wiring and process connections have been verified, apply power to the instrument. The instruments with the LCD will briefly show a

welcome screen indicating the software version followed by the normal operation process screen. The normal process screen indicates process flow

rate, total flow, temperature and pressure depending on the options ordered. The calibration group and group description are also displayed at the

bottom of the screen. Verify the process variable engineering units are correct.

Normal Operation Process Screen

I.R. Sensors

(4 places)

Advertising