5 subst aeration, 6 number of stages, 11 inputs – Hach-Lange RTC103 N-Module User Manual

Page 50: 1 min inflow, 2 max inflow, 3 0/4 to 20ma, 4 min recirculation, 5 max recirculation, 6 0/4 to 20ma, 7 q reci ratio

Advertising
background image

50

Parameterization and operation

4.10.5 SUBST AERATION

If the oxygen sensor (e.g. LDO) signals a fault, the set aeration
stage is selected (stages 1 to 6).

4.10.6 NUMBER OF STAGES

Number of controlled aeration stages (maximum 6).

4.10.7 VFD P MIN (For DO control without VFD option this is fixed to 100%)

Set minimum speed [%] for VFD controlled blowers.

4.11 INPUTS

There are available two mA input connector for each channel.
The first is the flowrate signal (inlet or effluent of plant or lane).

The second is for the recirculation flow rate or the return sludge
flow rate, depending on which is available and not travelled in
ratio to the inlet/outlet flow rate.

4.11.1 MIN INFLOW

Minimum flow rate of influent according to measurement signal
corresponding to 0/4mA

4.11.2 MAX INFLOW

Maximum flow rate of influent according to measurement signal
corresponding to 20mA

4.11.3 0/4 to 20mA

Transfer range of 0/4 to 20mA current loop as set in connected
flow measuring instrument.

4.11.4 MIN RECIRCULATION

Minimum recirculation flow rate according to measurement signal
corresponding to 0/4mA.

4.11.5 MAX RECIRCULATION

Maximum recirculation flow rate of influent according to
measurement signal corresponding to 20mA.

4.11.6 0/4 to 20mA

Transfer range of 0/4 to 20mA current loop as set in connected
flow measuring instrument.

4.11.7 Q RECI RATIO

If the value Q RECI RATIO is “0” the RECI flow is calculated
bases on the mA input signal. If the value is different from “0” the
RECI flow is calculated from the inflow:

Q RECI= Q RECI RATIO * INFLOW

within the limits of MIN RECIRCULATION and MAX
RECIRCULATION.

Advertising