POWER WIRING CONTINUED...

POWER WIRING

WIRING

SOLAR PANEL(S)

1

Locate the red and black wires connected to the J15 plug labeled DC POWER

on the control board. Unplug the wires from the bridge rectifier, located on

the back of the electrical box.

2

Connect the red (+) wire from the J15 plug to the red wire from the solar

panel.

3

Connect the black (-) wire from the J15 plug to the black wire from the solar

panel.

Junction Box Cover

Red Wire

Black Wire

Bridge Rectifier

J15 Plug

1

Turn off the AC power from the main power source circuit breaker.

2

Run the AC power wires to the junction box on the operator.

3

Remove the junction box cover.

4

Connect the green wire to the earth ground rod and AC ground using a wire

nut. NOTE: The earth ground rod can be grounded to the chassis.

5

Connect the white wire to NEUTRAL using a wire nut.

6

Connect the black wire to HOT using a wire nut.

7

Replace the junction box cover. Ensure the wires are not pinched.

120 VAC AND 240 VAC

NUMBER OF CYCLES PER DAY (SOLAR)

Slide Gate

Installation (16 ft.

1000 lb. gate)

CONFIGURATION

ZONE 1

(6 Hrs

sunlight/day)

ZONE 2

(4 Hrs

Sunlight/day)

ZONE 3

(2 Hrs

Sunlight/day)

Transmitters

Wireless Dual Gate

1 Loop (LD7LP)

7AH Batteries (standard)

33AH Batteries (optional)

7AH Batteries (standard)

33AH Batteries (optional)

7AH Batteries (standard)

33AH Batteries (optional)

20W SOLAR PANEL
NOTE:
20W would be two 10W

(12V) panels in series.

51

66

31

39

11

13

49

64

30

38

10

12

44

59

25

33

5

7

40

54

20

28

1

2

40W SOLAR PANEL
NOTE:
40W would be two 20W

panels in series.

90

144

70

92

31

39

88

142

69

90

30

38

83

137

64

85

25

33

79

132

59

80

20

28

NOT PROVIDED. SEE ACCESSORIES.
For solar applications DO NOT use the expansion board and the wireless dual gate feature. These features will substantially decrease the cycle rate

and standby time of the operator. The solar panel(s) must be located in an open area clear of obstructions and shading for the entire day. The gate operator is not

supported in northern climates where temperatures reach below -4˚F. This is due to cold weather and a reduced number of hours of sunlight during the winter months. Cycle

rate may vary from solar chart for areas that reach below 32˚F. Solar panels should be cleaned on a regular basis for best performance to ensure proper operation. For solar

applications, a minimum of two 10W solar panels in series and two 7AH batteries are recommended. For Zone 3 cold weather sites, two 33AH batteries are recommended. We

recommend LiftMaster low power draw accessories to minimize power draw, refer to accessory page.