Wiring, Dual gates only – Controlled Products Systems Group CSL24VH User Manual

Page 19

Advertising
background image

17

DUAL GATES ONLY

DUAL GATES ONLY

WIRING

Outside

Pr

oper

ty

Inside

Pr

oper

ty

!

!

COMM LINK

B

A

OM

N.C.

COMM LINK

B

A

OM

N.C.

2

1

3

4

Comm Link Data A

Comm Link Data B

Comm Link Data A

Comm Link Data B

Before digging, contact local underground utility locating companies. Use PVC conduit to prevent damage to cables.

1

Trench across driveway to bury the extension cable.

2

Connect the wires from the extension cable to the Comm Link terminals

on the primary gate operator control board.

3

Route the extension cable to the secondary gate operator's control

board.

4

Connect the wires from the extension cable to the Comm Link terminals

on the secondary control board (Comm Link A to Comm Link A and

Comm Link B to Comm Link B).

There are two options for dual gate communication: wired or wireless. Follow the directions according to your application. Do not use

wired and wireless communication simultaneously. Wired dual gate applications will have a longer battery standby time than wireless applications.

WIRED DUAL GATES

DUAL GATE WIRE TYPE (STRANDED COPPER WIRE)

22AWG up to 200 feet (61 m)

18AWG - 200-1000 feet

(61-305 m)

Wire must be rated at 30 Volt minimum

Advertising