Nova-Tech GKa Indicator User Manual

Page 10

Advertising
background image

8 © Adam Equipment Company 2011

5.

CONNECTION

This indicator must be connected to a load cell platform and calibrated as necessary

to match the platform and user requirements.

The GK has a connector configured for a 6 wire load cell. Connect the load

cells/platform to the indicator as shown below. The cable length should be as short

as possible, using a large size wire to minimise errors due to resistance in the leads.

GK-M model must use the 6 wire connection and has certain limitations for wire size

and length. Refer to the Approval Test Certificate for details.

Advertising