Mma-303 direct/indirect charge - installation, Electrical and fiber optic connections, Fluid connections – Ransburg MMA-303 Direct_Ind Charge Atomizer A12870 User Manual

Page 49: Typical installation, Air heater

Advertising
background image

MMA-303 Direct/Indirect Charge - Installation

LN-9269-11.3

46

ELECTRICAL AND FIBER OPTIC
CONNECTIONS

The fiber optic connection is made on the
back of the atomizer’s mounting manifold.
The fiber optic cable comes pre-assembled
with connectors that are secured in place with
a fiber optic tensioning fitting.

Maximum amount of splices for any length of
cable is 3. The speed detection signal may be
affected if splices are exceeded. Length in
any combination for the fiber optic is 100-feet.

FLUID CONNECTIONS

The paint, solvent, and dump fluid tubing are
connected on the back of the mounting mani-
fold with plastic fluid fittings. The tubing is
made of PFA. Fluid tubing requirements are
shown in “Fluid Tubing Connection Require-
ments” chart below.

FLUID TUBING CONNECTION REQUIREMENTS

Fixed Atomizer

Pressure (Maximum)

Paint Line (P)

6mm OD / PFA

200 psi max. (1379 kPa)

Cup Wash Solvent Line (SOL) A11283-00 Nylon Recirculation 150 psi max. (1033 kPa)

Tube-In-Tube, Indirect Charge

Dump Line (DL)

8mm OD / PFA

200 psi max. (1379 kPa)

TYPICAL INSTALLATION

The “Direct and Indirect Charge Typical Instal-
lation” figures in the “Installation” section
shows a typical installation of the applicator
with the MicroPak.

AIR HEATER

Connect air heater to turbine air tubing. Air
heater connection to bearing air is not re-
quired.

Advertising