2 grease supply on the vertical axis, Applicable grease and supply period, 2 grease supply – IAI America IX-NNN12040 User Manual

Page 55

Advertising
background image

4. Maintenance inspection

49

4.2 Grease Supply on the Vertical Axis

The ball screw and ball spline on the vertical axis require grease supply.

4.2.1

Applicable Grease and Supply Period

Grease to Apply

Supply Period

THK

AFG+70

Every 6 months

4.2.2 Grease Supply

For grease supply, take off one of the 2

nd

arm covers on the right and left, and supply 6 to 10cc

at two places grease nipple with using a grease gun. Also, do not forget to wipe away excess

grease. To take off the arm, refer to the figure. After grease supply is finished, move the

vertical so the supplied grease spreads out evenly over the steel balls inside the nut. To make

up/down operation, either to release the brake in order to have a manual operation or have

JOG operation.



Recommended Grease Gun MG70 (by THK)



Grease Nipple

for Grease Supply to Ball Screw

Cover Fixing Screws

11 places (one side)

Grease Nipple

for Grease Supply to Ball Spline

Warning: Do not attempt to apply fluorine grease. When mixed with lithium grease, not only

decrease the grease characteristics, but also may damage the driving part.

Caution: In case the grease got into your eye, immediately go see the doctor to get

appropriate care. After finishing the grease supply work, wash your hands

carefully with water and soap to rinse the grease off.

Advertising
This manual is related to the following products: