10 copy and paste scenarios – Teledyne LeCroy SierraNet M168 User Manual Ver.1.50 User Manual

Page 220

Advertising
background image

Teledyne LeCroy

InFusion Scenarios

218

 

 

SierraNet M168 Protocol Analyzer User Manual

4.5.10

Copy and Paste Scenarios

You can copy and paste scenarios from one project to another project. Perform the 
following steps to do so:

1. Select the scenario you want to copy in either the scenario name tab and select 

Copy or in the Library pane, right‐click and select Copy Scenario (see 

Figure 4.12 on 

page 218

).

Figure 4.12: Copy Scenario

2. Place the cursor in the area below <New Scenario> in the Library pane, in the 

project you want to paste in, right‐ click and select Paste Scenario.

Figure 4.13: Paste Scenario

Advertising