Thermo Fisher Scientific CyberScan 6000 Series Meters v.2 User Manual

Page 72

Advertising
background image

157

Conductivity Operation: Temperature Standardization

PC6000, CON6000, PC6500 and PCD6500 meters

Technology Made Easy ...

To Standardize Temperature of the Meter

1. Touch Standardize on the conductivity measure screen to access the standardized

screen.

2. Make sure conductivity cell with built ATC is attached to meter.
3. Immerse your conductivity cell with built ATC probe into a solution of known temperature,

such as a temperature bath, for a few minutes while temperature stabilizes.

4. Touch Temp Std to access temperature standardization
5. The Temperature Standardization screen appears. Check the current temperature

displayed with that of the solution of known temperature. Touch the Standardization
Temperature
box and use numeric keypad to enter the current temperature. Press Enter
to confirm value.

6. Touch OK to confirm Standardization Temperature and return to the conductivity

Measure screen. Touch Reset to reset and enter a new standardization temperature.
Touch Cancel to cancel temperature standardization and return to the conductivity
Standardization screen.

Note: The meter will not allow entered value to exceed ±5°C of the ATC probe value. If
entered value exceeds ±5°C an error window will appear and you will have to re-enter value
or cancel out of the temperature screen. This might indicate that you have a faulty ATC
probe.

Advertising