Pre commissioning checklist, Optichill chillers, Commissioning procedure – Airedale OptiChill FreeCool 500kW - 1365kW User Manual
Page 52
OPTICHILL
Chillers
52
Chillers
Installation & Maintenance : 6564868 02/2013
Commissioning Procedure
GENERAL
To be read in conjunction with the commissioning sheets provided, items highlighted
should be recorded.
CAUTION
Please ensure all documents have been completed correctly and return to Airedale
Technical Support immediately to validate warranty.
PRE COMMISSIONING CHECKLIST
CAUTION
ALL work MUST be carried out by Technically Trained competent personnel.
The equipment contains live electrical and moving parts, ISOLATE prior to
maintenance or repair work.
The unit isolators DO NOT isolate the incoming mains supply, but isolate the
individual electrical panels. Isolate REMOTELY the mains incoming supply to the
BUSBAR chamber prior to maintenance or repair work.
The door interlocking MCCB should be in the OFF position and the auxiliary alarm
contact from the MCCB should be linked out.
Ensure all items listed in the Pre commissioning section are complete.
RECORD
The unit should be visually inspected and any damage noted
Secure commissioning gauges to the high side of the system, check for a
positive charge
Check tightness of electrical components and properly terminated
Check that the remote on/off switch (if fitted) is in the off position
With the MCBs in the off position measure the incoming voltage
Check Phase Rotation
Check voltage at permanent supply
Measure and record the primary (230V) and secondary (24V) voltages at each of the
transformers, adjust tapping if necessary and record on the commissioning document
Check all timer settings are correct
Check compressor oil heater (ensure this is switched on for a minimum of 8 hours
prior to the unit operation)
Check oil level of each compressor
Check water filter is fitted
Check design water flow is available
Check flow switch and pump interlocks are fitted to the water system and wired
directly to the chiller and functioning correctly
Switch on the controls and individual circuits, primary and secondary, MCBs to the
ON position, at this stage the control display panel should be illuminated
Record Optional Extras
Record Controller Data
CAUTION
Disable remote ON/OFF to ensure the unit does not start unintentionally.
The chiller will not start until microprocessor control SWITCH 1 is in the ON
position. DO NOT SWITCH TO ON AT THIS STAGE